Jump to content

Veiw from your office


Recommended Posts

6 hours ago, Francie, said:

You looking a start frank lol why are you outside the fence,you not supposed to be inside working?

Lol ,I’m a decorator mate .don’t think they have need for one of those . 

Link to post
Share on other sites

  • Replies 7.1k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Leaving home for the office View from the office. Closer view from the office.....they are farmed deer.... The office. Planting new trees and re-establishing old lines

Beautiful day this morning. Cheers Arry

Posted Images

Well, I’m going to start the floor job on Wednesday, mate mentioned he needed some trees down so he could have solar panels installed, £2800 for someone to do it, day rate hfor me 

IMG_2444.jpeg

IMG_2443.jpeg

  • Like 4
Link to post
Share on other sites
3 minutes ago, gnipper said:

2800 for them few? Christ I'm in the wrong bit of the tree industry 

I think there’s 9 to come down and one of them is a big bugger, I would of thought for 2800 the would be chipping them and taking it away

Link to post
Share on other sites

not a current pic but I do stagecrew work part time on a seasonal basis.. there's always something different and I enjoy it. The pay can be brilliant or awful and the work is backbreaking but fun

20240827_195328.jpg

  • Like 1
Link to post
Share on other sites
3 hours ago, Stavross said:

Well, I’m going to start the floor job on Wednesday, mate mentioned he needed some trees down so he could have solar panels installed, £2800 for someone to do it, day rate hfor me 

IMG_2444.jpeg

IMG_2443.jpeg

Get them logs dropped off at my house 👍

Link to post
Share on other sites
8 hours ago, Francie, said:

Lol you dossing then

I was taking pictures to put together an archive on Bath …. 
ok , I’ll put my hands up …. I was having a doss lol 

Link to post
Share on other sites

Getting on well with this, I think we should have it all out for tomorrow and another day to put the sub base in, the lad who owns it has been with us all day and he’s a proper grafter, so what was looking like a week should be done in 3 days 

IMG_2463.jpeg

IMG_2465.jpeg

  • Like 2
Link to post
Share on other sites

Little dilemma, second part of the concrete floor out and there’s another one under it, only this one is exactly the height my stone needs to be, now building control will say it needs to come out, if it was mine I would visqueen it and pour the concrete, but that’s the customers decision 

IMG_2468.jpeg

  • Like 1
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...