id put an electric supply in before you concrete it.

i wish i had with my one instead of running and extension cable. what a fexking idiot i was :blink:

  • Like 4

Share this post


Link to post
Share on other sites

Looking good pal, get a blinding layer of sand over the top and a dpm, as above I would also put provision for services in, even if it's just a duct for now, takes minutes, costs pence but saves fortunes and hassle down the line.

  • Like 3

Share this post


Link to post
Share on other sites

Looking good pal, get a blinding layer of sand over the top and a dpm, as above I would also put provision for services in, even if it's just a duct for now, takes minutes, costs pence but saves fortunes and hassle down the line.

thanks mate, sounds like a plan

Share this post


Link to post
Share on other sites

Slow progress, honest thoughts, would this be ok??? its just been pushed in at corners, not been cut or taped, broken slabs to raise the mesh

 

15007581_10153869070716987_879316496_o_z

 

14975936_10153869070916987_625487680_o_z

 

15008017_10153869071096987_1734369419_o_

Share this post


Link to post
Share on other sites

Could of went another square with lap on mesh but it's spot on otherwise you could park a jumbo jet on that

Share this post


Link to post
Share on other sites

you reckon 2 squares??

 

ive not done anything for electric supply yet, its been bugging me lol ive not booked the lorry yet so theres still time if i decide to...

 

take it yous ment dig through the hardcore (wasnt sure about digging through the compacted hardcore), add abit piping to run wires through?

  • Like 1

Share this post


Link to post
Share on other sites

for the electrics just run some piping under the mesh with some string running through the pipe so if you do want electric in there just tie the cables to the string and pull them through :thumbs

And that looks spot on

  • Like 3

Share this post


Link to post
Share on other sites

for the electrics just run some piping under the mesh with some string running through the pipe so if you do want electric in there just tie the cables to the string and pull them through :thumbs

And that looks spot on

Or a ferret with the string attached to it, if you forget to thread a cord first that is ;):laugh:

  • Like 3

Share this post


Link to post
Share on other sites

you reckon 2 squares??

 

ive not done anything for electric supply yet, its been bugging me lol ive not booked the lorry yet so theres still time if i decide to...

 

take it yous ment dig through the hardcore (wasnt sure about digging through the compacted hardcore), add abit piping to run wires through?

1 and a half once you have a full square on one sheet sitting over a full square on the next pull a line across the top as well to make sure no mesh will be poking up above floor it can easily happen especially where 4 sheets meet.

Share this post


Link to post
Share on other sites

Get a 90 degree 4inch sewer bend with a short piece of pipe in each end and stick it one corner you will have enough room in it to bring in water feed,electric or any other service pipe afterwards under mesh will do fine no need to dig up hardcore it will probably be a steel wire armoured electric cable anyway so no need to go too deep.

  • Like 1

Share this post


Link to post
Share on other sites

you reckon 2 squares??

 

ive not done anything for electric supply yet, its been bugging me lol ive not booked the lorry yet so theres still time if i decide to...

 

take it yous ment dig through the hardcore (wasnt sure about digging through the compacted hardcore), add abit piping to run wires through?

Where are you mate? I have about 60/70 ft of one inch armour cable that will be good for the electrics. You can have if want mate
  • Like 1

Share this post


Link to post
Share on other sites

keep mesh back off shuttering by 50 mm,stops the ends showing and going rusty.

  • Like 1

Share this post


Link to post
Share on other sites

 

you reckon 2 squares??

 

ive not done anything for electric supply yet, its been bugging me lol ive not booked the lorry yet so theres still time if i decide to...

 

take it yous ment dig through the hardcore (wasnt sure about digging through the compacted hardcore), add abit piping to run wires through?

Where are you mate? I have about 60/70 ft of one inch armour cable that will be good for the electrics. You can have if want mate

 

 

 

edinburgh :thumbs:

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

Sign in to follow this  

  • Recently Browsing   0 members

    No registered users viewing this page.

×