Concrete Sub-Base - Question For The Builders


Recommended Posts

 

Lads I am ready to go. Channel drains are in and I have a natural slope to the drain due to the lie of the land. Just to shutter with 1 degree of slope towards the drains and I am ready to mix concrete. I'll go with what I have got 11 bags of cement and 2 ton of sand gravel ontop of my already laid 2ton of blinding. If I fall short that is a good thing. It means I can do the last foot to the drains to make an absolutely first class job of how the water flows away.

 

I'll get photos up in the next fortnight of the finished. Great to get the advice.

remember to make the concrete 5-10mm higher than the Chanel drain,wf
Why 10 mm higher I run mine flush ?
Link to post

  • Replies 36
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

We normally use at 10 bags of cement per ton not 5 I think it will be two weak

4x2 is 100 MM deep mate there for you'll need 1.2 cubic metres

Think it needs to be at least 4 inches or 100mm deep.

This is what you want to paint the run floors with.

If it can handle millions of car tyres.

A brush and a terriers feet won't touch it.

Ive used yellow line paint in kennels before.

Waterproof.frost proof etc.

It's what I'm going to use this year in the new runs.

http://adbrufdirect.co.uk/road-marking-paint/clearline-traffic-paint.htm

  • Like 1
Link to post

I tell you what, that adbruf aggregate looks a great job for ground around the pen. Looks like aggregate but able to take a good powerhosing.

 

Great one King.

That line paint will take some serious abuse RT.

That's about the cheapest place I found for it on the net.

Link to post

 

 

Lads I am ready to go. Channel drains are in and I have a natural slope to the drain due to the lie of the land. Just to shutter with 1 degree of slope towards the drains and I am ready to mix concrete. I'll go with what I have got 11 bags of cement and 2 ton of sand gravel ontop of my already laid 2ton of blinding. If I fall short that is a good thing. It means I can do the last foot to the drains to make an absolutely first class job of how the water flows away.

 

I'll get photos up in the next fortnight of the finished. Great to get the advice.

remember to make the concrete 5-10mm higher than the Chanel drain,wf
Why 10 mm higher I run mine flush ?
for the water to run in to the drain easier,if its flush it will sometimes run along the top of the drain without going in,wf
  • Like 1
Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...