Im new to longnets Iv 2 50 yarders and 1 20 yard net I usually set 1 50 yard net lenght ways along one side of the ditch and the other one down along the other side of the ditch and the 20 yard net I set through the ditch where the 50 yard nets end. on the ferreting section a lad was saying he sets his long net in a zig zag along the ditch does anyone set their nets this way can any one explain this or put up a pic of it as I may try it next time Im out or is the way Im seting them ok I do miss a few if they hole hop thanks