Jump to content


Photo

Garage


  • Please log in to reply
21 replies to this topic

#16 Lukey12

Lukey12

    Mega Hunter

  • Members
  • PipPipPipPip
  • 344 posts
  • Location:South yorkshire

Posted 17 November 2016 - 07:18 pm

Anyone
  • CharlesRono likes this

#17 leethedog

leethedog

    Extreme feltcher

  • Members
  • PipPipPipPipPipPipPipPip
  • 3,138 posts
  • Location:Up the shit pipe

Posted 20 November 2016 - 10:03 am

Just remember most garage floors have a fall in them back to front and piss flows down hill
  • foxdropper likes this

#18 Lukey12

Lukey12

    Mega Hunter

  • Members
  • PipPipPipPip
  • 344 posts
  • Location:South yorkshire

Posted 20 November 2016 - 08:00 pm

Just remember most garage floors have a fall in them back to front and piss flows down hill

thanks Lee... you ever done a similar set up or used tiles?

#19 leethedog

leethedog

    Extreme feltcher

  • Members
  • PipPipPipPipPipPipPipPip
  • 3,138 posts
  • Location:Up the shit pipe

Posted 23 November 2016 - 02:54 pm

Used to have a sleep box built in under the work bench in the back of my garage but no runs had a door from garage to garden always open

Attached Files



#20 foxdropper

foxdropper

    Extreme Hunter

  • Donator
  • 8,629 posts
  • Location:Wiltshire or there abouts

Posted 28 November 2016 - 09:07 am

Shutter off as far as you need with a timber and create new fall to the area required using flooring grit and a plastic float .Ideal to tile over after .

#21 Lukey12

Lukey12

    Mega Hunter

  • Members
  • PipPipPipPip
  • 344 posts
  • Location:South yorkshire

Posted 28 November 2016 - 10:32 pm

Shutter off as far as you need with a timber and create new fall to the area required using flooring grit and a plastic float .Ideal to tile over after .

thanks mate I will look into this... any ideas on drainage??? I'm no builder so could use some help/ideas

#22 francolin

francolin

    Extreme Hunter

  • Members
  • PipPipPipPipPipPipPipPip
  • 1,371 posts
  • Location:sheffield

Posted 03 December 2016 - 09:31 am

as foxdropper said ,make a new fall,make sure it falls to door opening so it can then be swilled out into pen area at back, pen area falls to a drain ,job done, if weather is good they will urinate out doors hopefully




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users